Tank lid test fitment
Posted on 13 December, 2015 at 14:01 5500kgs tank lid being lifted into place to check for fitment
-
Gantry crane movement
Posted on 6 December, 2015 at 12:27 17 metre gantry crane being transported & lifted into position
-
4m Diamter Pipes delivered to Swaffarm Prior
Posted on 6 December, 2015 at 12:23 4 metre diameter drainage pipes being delivered into Swaffarm Prior Pipes will be used to collect...
-
Frezenberg Ridge war memorial
Delivering the Frezenberg Ridge memorial carving in Newport , as you can imagine this is a one off carving to commemorate the fallen...
-
3.7 m Wide Wind Turbine base
Posted on 6 December, 2015 at 12:06 Wind Turbine bases being placed in the Welsh valleys